Friday, March 29, 2024
37.0°F

Legals for June, 29 2021

| June 29, 2021 12:00 AM

Public Notice Announcing the Availability of a Finding of No Significant Impact DEPARTMENT OF AGRICULTURE Rural Development Bonner County: Notice of Finding of No Significant Impact ACTION: Notice of Finding of No Significant Impact. SUMMARY: The USDA RD has made a Finding of No Significant Impact (FONSI) with respect to a request for possible financing assistance to Bonner County Solid Waste (BCSW) for construction of various solid waste facility improvements, to be constructed at the Colburn, Idaho Hill, Dickensheet and Dufort Sites. FURTHER INFORMATION: To obtain copies of the EA and FONSI, or for further information, contact: John Lynn, Community Program Specialist, USDA Rural Development (RD), 7830 Meadowlark Way, Suite C3, CDA, ID 83815, (208) 209-4363, john.lynn@usda.gov. SUPPLEMENTARY INFORMATION: BCSW proposes to upgrade and improve four of the primary solid waste collection sites within the County. The proposed improvements, by site, are as follows: Colburn *Add a new Household Hazardous Waste (HHW) building to collect and process HHW in the County. *Remodel/recondition the existing waste transfer building for safe and efficient operations. *Add a new waste transfer building to provide more space for waste processing as well as provide a second location for residents (public) to unload waste. *Site improvements (grading, drainage, and paving) *Site traffic control and circulation improvements with striping and signage for access, and traffic flow modifications. *Add an automated scale to weigh commercial vehicles arriving and departing the site. Dickensheet *Replace the failing retaining (eco-block) walls with structural concrete walls. *Pave main yard area, wood waste pile, and access road to mitigate fugitive dust and contact water leaching into the soil. *Add site security with a 6-ft tall perimeter chain link fence with privacy slats, yard lights, and surveillance cameras. The perimeter fencing will also collect windblown litter before it leaves the site. *Add site water by installing a water supply well. Dufort *Add additional site capacity by expanding the public drop-off area with a new z-wall. *Pave the operational areas and in the location of the proposed new z-wall. *Modifying and improving the drainage system for the z-wall expansion and shifting the drainage. Idaho Hill *Replace the failing retaining (eco-block) walls with structural concrete walls. *Pave main yard area, wood waste pile, and tire/cardboard collection area to mitigate fugitive dust and contact water leaching into the soil. *Add a shop building for vehicle and equipment servicing and an area for an office and restroom. *Add site security with a 6-ft tall perimeter chain link fence with privacy slats, yard lights, and surveillance cameras. The perimeter fencing will also collect windblown litter before it leaves the site. *Install a water well and septic system to service the site and new shop building. Several alternatives were considered by the USDA RD and Bonner County for improving and expanding the waste collection sites to provide efficient and safe solid waste operations. The alternatives are discussed in the Bonner County Solid Waste EA. The USDA RD has reviewed and approved the EA for the proposed project. The availability of the EA for public review was announced via notice in the following newspaper: Daily Bee on May 27, 28, and 29, 2021. A 14-day comment period was announced in the newspaper notice(s). The EA was also available for public review at the USDA Rural Development office and website as well as the BCSW's office. No comments were received. Based on its EA, commitments made by the BCSW, and public comments received, USDA RD has concluded that the project would have no significant impact (or no impacts) to water quality, wetlands, floodplains, land use, aesthetics, transportation, or human health and safety. The proposed project will have no adverse effect on resources listed or eligible for listing on the National Register of Historic Places. The Agency has also concluded that the proposed project is not likely to affect federally listed threatened and endangered species or designated critical habitat thereof. The proposed project would not disproportionately affect minority and/or low-income populations. No other potential significant impacts resulting from the proposed project have been identified. Therefore, USDA RD has determined that this FONSI fulfills its obligations under the National Environmental Policy Act, as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality Regulations (40 CFR ยงยง 1500-1508), and USDA Rural Development's Environmental Policies and Procedures (7 CFR Part 1970) for its action related to the project. USDA RD is satisfied that the environmental impacts of the proposed project have been adequately addressed. USDA RD federal action would not result in significant impacts to the quality of the human environment, and as such it will not prepare an Environmental Impact Statement for its action related to the proposed project. SNP LEGAL 8686 AD#466642 JUNE 29, 2021

REQUEST FOR QUALIFICATIONS Municipal Engineering Services The City of Clark Fork, Bonner County, Idaho, is requesting Statements of Qualification (SOQ) from professional engineering firms for the purpose of providing contracted municipal engineering services for the City of Clark Fork. Contracted Municipal Engineering Services Information about the project and a complete Request for Qualifications (RFQ) package can be obtained by contacting Amber Burgess at 110 E. 3rd Ave/P.O. Box 10, Clark Fork, Idaho 83811, (208)266-1315, city@clarkforkidaho.org. Six (6) individual copies, along with one thumb drive of the proposal should be submitted to the attention of Amber Burgess at the aforementioned address and clearly marked on the outside "Request for Qualifications- Municipal Engineering Services" no later than 1 p.m. local time, Monday, July 26, 2021. Inquiries regarding this RFQ should be directed to: Amber Burgess, City Clerk City of Clark Fork P.O. Box 10 Clark Fork, Idaho 83811 (208)266-1315 city@clarkforkidaho.org SNP LEGAL 8689 AD#466679 JUNE 29, JULY 6, 2021

NOTICE TO CREDITORS (I.C. 15-3-801) IN THE DISTRICT COURT OF THE FIRST JUDICIAL DISTRICT OF THE STATE OF IDAHO, IN AND FOR THE COUNTY OF BONNER IN THE MATTER OF THE ESTATE OF Case No. CV09-21-0836 James R. Cavanaugh and Patricia A. Cavanaugh Deceased NOTICE IS HEREBY GIVEN that Katrina A. Cavanaugh has been appointed Personal Representative of the above-named Estate. All persons having claims against the decedent or the Estate are required to present their claims within four (4) months after the date of the first publication of this Notice to Creditors, or said claims will be forever barred. Claims must be presented to the undersigned at the address indicated and filed with the Clerk of the Court. Dated this 17 day of June, 2021 /s/ Rebecca R. Eyman Attorney at Law LEGAL 8679/ AD 465009 JUNE 22, 29, JULY 6, 2021

NOTICE TO CREDITORS (I.C. 15-3-801) IN THE DISTRICT OF THE FIRST JUDICIAL DISTRICT OF THE STATE OF IDAHO, IN AND FOR THE COUNTY OF BONNER IN THE MATTER OF THE ESTATE OF Case No. CV09-21-0641 JUNE V. PETERSEN NOTICE IS HEREBY GIVEN that the undersigned has been appointed personal representative of the above-named decedent. All persons having claims against the decedent or the estate are required to present their claims within four (4) months after the date of the first publication of this Notice or said claims will be forever barred. Claims must be presented to the undersigned at the address indicated, and filed with the Clerk of the Court. DATED this 24 day of May, 2021. /s/ Mary Anderson, Personal Representative c/o ELTC Law Group, PLLC Denise M. Stewart, Attorney PO Box 301 Newport, WA 99156 LEGAL 8675/AD 464883 JUNE 22, 29, JULY 6, 2021

N O T I C E O F L E T T I N G Idaho Project No. A023(120), in Bonner County, Key No. 23120; for the work of widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes, mill & inlay of Lakeshore Rd and bridge approach. Sealed proposals will be received only at the office of the IDAHO TRANSPORTATION DEPARTMENT, 3311 WEST STATE STREET, BOISE, IDAHO 83703, ATTN: ADVERTISEMENT AND AWARD. Bids may also be submitted electronically through Bid Express (www.bidx.com.). All bids must be received by two o'clock p.m., on July 13, 2021. ADDITIONAL INFORMATION CONTACT: RESIDENT ENGINEER JUSTIN WUEST at (208) 772-1253 for any design related questions. Digital copies of the Plans, Proposals, and Specifications must be downloaded for a fee of $15.00. Bidders must appear on the plan holders list for their proposal to be accepted by the Department. Please contact QuestCDN.com at 952-233-1632 or info@questcdninfo.com for assistance in downloading and working with this digital project information. General Bidding information and Specifications may be obtained from the Idaho Transportation Department website at http://itd.idaho.gov/business/ This contract requires full compliance with Title VI of the Civil Rights Act of 1964, which protects persons from being denied the benefits of or excluded from participation in programs or activities; or subjected to discrimination based on race, color, national origin, sex, age, disability, Limited English Proficiency or economic status. The Contractor is encouraged to utilize the goods and services of disadvantaged firms in accomplishing the tasks or providing the services of this agreement, and to provide equal opportunity to all sub-bidders and suppliers. SNP LEGAL 8687 AD#466646 JUNE 29, JULY 6, 2021

NOTICE OF HEARING ON NAMECHANGE (Adult or Emancipated Minor) IN THE DISTRICT COURT FOR THE JUDICIAL DISTRICT FOR THE STATE OF IDAHO, IN AND FOR THE COUNTY OF BONNER IN RE: LYNN MARIE FOUTCH Case No. CV09-21-0908 A Petition to change the name of LYNN MARIE FOUTCH, now residing in the City of Sandpoint, State of Idaho, has been filed in the District Court in Bonner County, Idaho. The name will change to Lynn Marie Foutch. The reason for the change in name is: to terminate Gaurdian - Ward relationship and to correct mistakes, potential fraud or confusion that exists in relation to the all caps name. A hearing on the petition is scheduled for 11 o'clock a.m. on 7/28/2021 at bonner County Courthouse. Objections may be filed by any person who can show the court a good reason against the name change. Date: June 16, 2021 CLERK OF THE DISTRICT COURT /s/ Charity L. Hadley Deputy Clerk LEGAL 8680/ AD 465066 JUNE 22, 29, JULY 6, 13, 2021

LEGAL NOTICE Notice of self-storage sale according to Idaho Code 55-2306. Please take notice Peck Farm Store Storage located at 106 Roy Way, Sagle, ID 83860 intends to hold an auction of the goods stored in units: #56 & #57 in default for nonpayment of rent. The auction will occur at 106 Roy Way, Sagle on July 12, 2021 at 10:00 a.m. The description of the contents is miscellaneous items. Tenant name and last known address are listed: Jeri Hansen PO Box 622, Cocolalla, ID 83813. All property is being stored at the above self-storage facility. The sale may be withdrawn at any time without notice or items may be disposed of. Certain items and conditions apply. SNP LEGAL 8688 AD#466672 JUNE 29, 2021