Legals for May, 1 2020
SUMMONS FOR PUBLICATION IN THE DISTRICT COURT OF THE FIRST JUDICIAL DISTRICT OF THE STATE OF IDAHO, IN AND FOR THE COUNTY OF BONNER ALAN M. CORNING and KELLY K. CORNING, husband and wife, Plaintiffs, v. All those claiming an interest in and to that certain real property described as: A Tract of land located in Section 20, Township 54 North, Range 5 West, B.M., Bonner County, Idaho, being described as follows: Beginning at the intersection of the vacated extend right-of-way line of the Chicago, Milwaukee, St. Paul and Pacific Railroad and the northerly right-of-way line of Rusho Lane (said point bears S0°06'25"W, 1443.92 feet and S89°53'35"E, 605.84 feet all from the northerly quarter corner of said section 20); thence N58°39'51"W, along said northerly right-of-way line, 131.39 feet; thence continuing along said northerly right-of-way line and a curve to the right, 374.44 feet (radius = 1775.00 feet, delta = 12°05'12", chord = N52°37'15"W, 373.74 feet); thence continuing along said northerly right-of-way line, N46°34'39"W, 246.77 feet; thence N36°39'42"E, 2.18 feet to the southerly vacated boundary line of the Chicago, Milwaukee, St. Paul and Pacific Railroad; thence along said vacated southerly boundary line of the Chicago, Milwaukee, St. Paul and Pacific Railroad and a non-tangent curve to the left, 741.15 feet (radius = 5779.65 feet, delta = 7°20'50", chord = S57°36'41"E, 740.64 feet); thence S28°42'54"W, along the northerly extension line of the vacated right-of-way line of the Chicago, Milwaukee, St. Paul and Pacific Railroad, 79.67 feet to its intersection with said northerly right-of-way line of Rusho lane and the point of beginning. Said parcel containing approximately 0.87 acres. Defendants. CV09-20-0527 To: All those claiming an interest in and to that certain real property described as: A Tract of land located in Section 20, Township 54 North, Range 5 West, B.M., Bonner County, Idaho, being described as follows: Beginning at the intersection of the vacated extend right-of-way line of the Chicago, Milwaukee, St. Paul and Pacific Railroad and the northerly right-of-way line of Rusho Lane (said point bears S0°06'25"W, 1443.92 feet and S89°53'35"E, 605.84 feet all from the northerly quarter corner of said section 20); thence N58°39'51"W, along said northerly right-of-way line, 131.39 feet; thence continuing along said northerly right-of-way line and a curve to the right, 374.44 feet (radius = 1775.00 feet, delta = 12°05'12", chord = N52°37'15"W, 373.74 feet); thence continuing along said northerly right-of-way line, N46°34'39"W, 246.77 feet; thence N36°39'42"E, 2.18 feet to the southerly vacated boundary line of the Chicago, Milwaukee, St. Paul and Pacific Railroad; thence along said vacated southerly boundary line of the Chicago, Milwaukee, St. Paul and Pacific Railroad and a non-tangent curve to the left, 741.15 feet (radius = 5779.65 feet, delta = 7°20'50", chord = S57°36'41"E, 740.64 feet); thence S28°42'54"W, along the northerly extension line of the vacated right-of-way line of the Chicago, Milwaukee, St. Paul and Pacific Railroad, 79.67 feet to its intersection with said northerly right-of-way line of Rusho lane and the point of beginning. Said parcel containing approximately 0.87 acres. You have been sued by ALAN M. CORNING and KELLY K. CORNING, husband and wife, the Plaintiffs, in the District Court in and for Bonner County, Idaho, Case No. CV09-2020-0527. The nature of the claim against you is for quiet title to the real estate described in the case caption and Complaint. Any time after twenty-one (21) days following the last publication of this Summons, the court may enter a judgment against you without further notice, unless prior to that time you filed a written response in the proper form, including the case number and paid any required filing fee to the Clerk of the Court at Bonner County Courthouse, 215 S. First Avenue, Sandpoint, Idaho 83864, telephone number (208)265-1432, and served a copy of your response on the Plaintiffs' attorney, John A. Finney, of Finney Finney & Finney, P.A., Old Power House Building, 120 East Lake Street, Suite 317, Sandpoint, Idaho 83864, telephone number (208)263-7712. A copy of the Summons and Complaint can be obtained by contacting either the Clerk of the Court or the attorney for the Plaintiffs. If you wish to have legal assistance, you should immediately retain an attorney to advise you in this matter. DATED April 17, 2020. BONNER COUNTY DISTRICT COURT By: /s/ A Augustine Deputy Clerk SNP LEGAL 7705 AD#377846 APRIL 24, MAY 1, 8, 15, 2020
SUMMARY OF GARFIELD BAY WATER & SEWER DISTRICT ORDINANCE 2020-001 AN ORDINANCE ADDRESSING REGULATIONS FOR APARTMENTS AND ACCESSORY UNITS BUILT ON SINGLE FAMILY RESIDENTIAL PARCELS AND ESTABLISHING CONNECTION REQUIREMENTS AND FEES. /s/Vicki Wininger, District Clerk SNP LEGAL 7727 AD#379501 MAY 1, 2020
NOTICE OF APPLICATION Pursuant to Section 58-104(9) and 58-1301, et seq., Idaho Code (The Lake Protection Act) and rules of the State Board of Land Commissioners, notice is hereby given that Tracey Wynhoff Hubbard has made application to install 100 linear feet of riprap on the Pend Oreille River. Location: Lot 1 Eric's Haven, Pend Oreille River, Priest River, Idaho, in Section 4 Township 55 North, Range 4 West; B.M., in Bonner County. Written objections to or requests for hearing in this matter must be on file with the Idaho Department of Lands, 2550 Highway 2 West, Sandpoint, Idaho 83864 within thirty (30) days after the first appearance of this notice. Specific information regarding this application may be obtained from Justin Eshelman, Resource Specialist, Sr. on behalf of Public Trust Program - at the above address or by calling (208) 263-5104. /S/ TOM FLEER, Area Manager Idaho Department of Lands SNP LEGAL 7709 AD#377997 APRIL 24, MAY 1, 2020
Idaho Department of Commerce Notice of Public Hearing & Comment Period Amendment to 2020-2024 Five-Year Consolidated Plan for Idaho's Federal Affordable Housing and Community Development Programs The Idaho Department of Commerce is seeking public comment on amendments to the 2020-2024 Consolidated Plan and 2020 Action Plan. The amendments will address the needs in response to the coronavirus that are eligible for Community Development Block Grant (CDBG) CARES Act funding. The funding will be used to prevent, prepare, and respond to the coronavirus and will be administered in accordance with programmatic requirements. A draft will be available during the comment period on Commerce's website at http://commerce.idaho.gov/communities/community-grants/community-development-block-grant-cdbg/consolidated-planning-documents A five-day comment period will run from May 4, 2020 through May 8, 2020. The comment period is required prior to submitting the amended plan to HUD. Written comments can be submitted by mail, fax, or email. Submit written comments to: CDBG Program - Mail: Idaho Department of Commerce, attn: Dennis Porter P.O. Box 83720, Boise, ID 83720-0093; Fax: 208-334-2631; Email - dennis.porter@commerce.idaho.gov; A Virtual Public Hearing will be held on May 7, 2020 from 3:00 p.m. to 4:00 p.m. MT . Join the meeting from your computer, tablet or smartphone at: https://global.gotomeeting.com/join/731645717 You can also dial in using your phone. United States: +1 (872) 240-3311 Access Code: 731-645-717 New to GoToMeeting? Get the app now and be ready when your first meeting starts: https://global.gotomeeting.com/install/731645717 The English and Spanish version of this notice can be found at Commerce's website -http://commerce.idaho.gov/communities/community-grants/community-development-block-grant-cdbg/consolidated-planning-documents
ADVERTISEMENT FOR BIDS KALISPELL BAY SEWER DISTRICT NORDMAN, IDAHO PHASE III REUSE SITE EXPANSION General Notice Kalispell Bay Sewer District (Owner) is requesting Bids for the construction of the following Project: Phase III Reuse Site Expansion [M-052-05] Bids for the construction of the Project will be received at 7B Engineering located at 414 Church Street, Suite 205 F, Sandpoint, Idaho, 83864 until Thursday, May 22nd, 2020 at 5:00 pm local time. At that time the Bids received will be privately opened and read. The Project includes the following Work: KSBD intends to increase their recycled water reuse area by 50% (4 irrigation laterals (4" HDPE) with 8 irrigation risers each and an irrigation manifold (6" HDPE) extension of 507 LF. The work will primarily involve excavation and fusion welding HDPE pipe. Bids are requested for the following Contract: Kalispell Bay Sewer District - Phase III Reuse Site Expansion [M-052-05] Owner anticipates that the Project's total bid price will be approximately $150,000. The Project has an expected duration of 90-180 days. Obtaining the Bidding Documents Information and Bidding Documents for the Project can be received from Google Drive by a link provided by submitting a request to: info@7BEngineering.com Bidding Documents may be downloaded from the Drive folder when the link is provided. Prospective Bidders are urged to register as a plan holder by emailing the engineer, even if Bidding Documents are obtained from the engineers' office or source other than the designated Drive folder in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. The Issuing Office for the Bidding Documents is: 7B Engineering 414 Church Street, Suite 205 F Sandpoint, Idaho 83864 (208) 263-0623 info@7BEngineering.com Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8:00 am to 5:00 pm , and may obtain copies of the Bidding Documents from the Issuing Office as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Printed copies of the Bidding Documents may be obtained from the Issuing Office by paying a non- refundable deposit of $60 for each set. Make deposit checks for Bidding Documents payable to 7B Engineering. Bidding Documents may be purchased from the Issuing Office during the hours indicated above. Cost does not include shipping charges. Upon Issuing Office's receipt of payment, printed Bidding Documents will be sent via the prospective Bidder's delivery service. The shipping charge amount will depend on the shipping method chosen. Bidding Documents are available for purchase in the following formats: Format Cost Bidding Documents (including Full-Size Drawings) $60 Electronic download of Bidding Documents from info@7BEngineering.com $0 A pre-bid conference for the Project will be held on May 12, 2020 at 11:00 AM at the Kalispell Bay Sewer District office, 851 Kalispell Bay Road, Nordman, ID 83848. Attendance at the pre-bid conference is encouraged but not required. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. This Advertisement is issued by: Owner: Kalispell Bay Sewer District By: 7B Engineering Title: Engineer Date: May 1, 2020 SNP LEGAL 7724 AD#379004 MAY 1, 8, 2020